Most homeowners looking at an ADU in Los Angeles have the same first question: what does this actually involve? Not the brochures. The real sequence of work, and who does what.
Here's how we run ADU projects at BB Builders. One team handles every part of it in-house. You deal with us from the first appointment to the final walkthrough. No handoffs to subcontractors you've never met. That's how we've done it for 20 years, and it changes what the process feels like.
Start With an Appointment
ADU projects start by appointment. Call us at +1 232 2322 233 or email nmdev@1realtour.com. Our hours are Wednesday, 9am to 10pm.
The first conversation is simple. We look at your property, talk about what you want the ADU to do - rental income, space for family, a home office - and walk through what's realistic for your lot. Short sentences, real answers. If an ADU isn't the right fit, we'll tell you that too.
Planning and Design
Once you decide to move forward, the planning phase begins. This is where the ADU takes shape on paper: size, layout, where the doors and windows go, how it connects to the rest of the property.
Because we build and finish ADUs ourselves, the design work happens with the people who will actually do the building. That matters. When the same team draws the plans and swings the hammers, nothing gets lost in translation. The plan on paper matches the build on the ground.
You'll review the plans with us and ask questions until you're satisfied. We'd rather answer ten questions now than one complaint later.
Permits
Permits come next. Los Angeles has its own rules for ADUs, and the paperwork has to be right before anyone breaks ground.
This is part of the project we handle. You don't chase departments or figure out which form goes where. We manage the permit process as part of the build, because it's part of the build. One team, one scope.
Construction
Now the visible work starts. Site prep, foundation, framing, roofing, rough plumbing and electrical. Then the ADU starts looking like a building instead of a plan.
A few things worth knowing about how we run this phase:
- One crew, one schedule. The same team that started your project is the team that finishes it. Nobody waits weeks for a subcontractor to show up.
- You always know who to call. It's us. One number, one email, one point of contact from day one.
- Work happens in order. Framing before plumbing, plumbing before drywall. Sequencing is our job, not yours.
We keep the site tidy and we keep moving. Homeowners live next to ADU construction, sometimes right through it. We respect that.
Finishes
This is the part homeowners look forward to: flooring, paint, cabinets, fixtures, counters. The ADU goes from a structure to a home.
Because everything is in-house, the finish work doesn't sit at the bottom of someone else's to-do list. It's part of our schedule, planned from the start. When we say the ADU is built and finished, we mean it - ready to live in, ready to rent, ready for whatever you planned it for.
Final Walkthrough
We don't consider an ADU done until you've walked through it with us. We go room by room. Anything that needs adjustment, we adjust. Then we hand over a finished space you can use immediately.
Why One Team Matters for an ADU
ADUs are smaller than new home construction, but they're not simple. They pack a kitchen, a bathroom, living space, and all the systems behind the walls into a compact footprint. Lots of different trades touch that project.
When those trades are separate companies, you become the coordinator. Delays in one trade push everyone else back. When something goes wrong, two contractors point at each other, and you're in the middle.
When it's one team, none of that happens. We built it, so we fix it. We scheduled it, so it runs on time. After 20 years in business, we've learned that the single biggest thing we can offer a homeowner isn't a sales pitch. It's accountability that never splits.
What Else We Build
ADUs are one part of what we do. BB Builders also handles:
- Bathroom remodeling - full renovations and upgrades
- Kitchen remodeling - renovations from cabinets to counters
- New home construction - building new homes from the ground up
Many ADU clients come back to us for the next project. A rental ADU this year, a kitchen remodel next. Because we know their property already, the second project starts faster than the first.